27th September, 2019 In accordance with the Exchange Letter signed on November 1st , 2018 by and between the Government of Tonga and the Government of the People’s Republic of China on the proposed Grant of Tonga Wind Power Project (hereinafter referred to as “the Project”), a delegation from China Energy Engineering Group Hunan Electric Power Design Institute Co., LTD., entrusted by Chinese Government, has been conducting preliminary engineering survey in Tongatapu for the implementation of the Project since late August.

