Short inspection report to the FSM (Pohnpei) . The aim of the inspections carried out by the REP-5 Programme Management Unit (PMU) in Pohnpei, Chuuk and Yap was to ensure that the supply and installation of the 161 off- grid PV systems were done following the agreement terms and conditions. The PV systems were designed and implemented as rooftop installations at seven sites; as flat roof installations at six sites; and as ground-mounted installations at three sites. This report covers various places like identifying variations between what was included in the contract and what was supplied and installed; the quality of installation; any design problems encountered.