PCREEE
Published on PCREEE (https://pcreee.org)

Home > Solomon Islands Gold Ridge Mine, 1996, Feasibility Study

Solomon Islands Gold Ridge Mine, 1996, Feasibility Study

Attached in this record are some pages from the feasibility study of the Goldridge Mine undertaken in 1996, before the mine was commissioned. It provides background information on the power demand needed at Gold Ridge. Report provided by the Solomon Islands Mines Department.

Authors: 
MinProc Engineers Limited
Publication Category: 
Technical Publications [1]
Year Published: 
1996
Countries covered: 
Solomon Islands [2]
Attachments: 
https://prdrse4all.spc.int/system/files/grml_feasibillity_study_power_supply.pdf [3]
Original Link: 
https://prdrse4all.spc.int/node/4/content/solomon-islands-gold-ridge-mine-1996-feasibility-study [4]

Source URL: https://pcreee.org/publication/solomon-islands-gold-ridge-mine-1996-feasibility-study

Links
[1] https://pcreee.org/publication-categories-prdr/technical-publications
[2] https://pcreee.org/countries-prdr/solomon-islands
[3] https://prdrse4all.spc.int/system/files/grml_feasibillity_study_power_supply.pdf
[4] https://prdrse4all.spc.int/node/4/content/solomon-islands-gold-ridge-mine-1996-feasibility-study